Onsite:
- Install handholes, duct banks, and pipe supports
- Begin exterior framing for stucco system
- Installation of plumbing, electrical, and HVAC systems
- Pressure test entire BPS piping system
- Begin priming and coating interior walls
- Final grade of road base
- Complete solar field installation
- Ground Storage Tank Coatings
- Complete roofing fascia and pump room roofing
- Install roll up overhead door
Offsite installations:
- Pull cable from Booster Pump Station to Laurel Road
- Complete installation of air relief valve boxes on Gene Green and Perimeter Roads