Venice City Water Booster Construction Update January 2025

Onsite:

  • Install handholes, duct banks, and pipe supports
  • Begin exterior framing for stucco system
  • Installation of plumbing, electrical, and HVAC systems
  • Pressure test entire BPS piping system
  • Begin priming and coating interior walls
  • Final grade of road base
  • Complete solar field installation
  • Ground Storage Tank Coatings
  • Complete roofing fascia and pump room roofing
  • Install roll up overhead door

Offsite installations:

  • Pull cable from Booster Pump Station to Laurel Road
  • Complete installation of air relief valve boxes on Gene Green and Perimeter Roads

See map here.